1、安装部位
设备置放的部位,四周尽量留通路可以出入,便于日后维护保养。
2、机器设备的固定不动
调节四支地脚螺丝,在设备上置放水准仪,调节螺钉的高度,使设备水准,并锁紧螺母。
3、电源安装
请采用适合的电缆线配电
设备的操作步骤:
接好外电源
开启漏电保护器电源
时间控制器上设置除汽泡的时间
调整标准气压减压阀到设置标准气压
做完以上工作中可以开始工作了
About Us
Company Honor Organization CultureProduct
General-purpose polystyrene equipment Reaction stirring equipment Heat exchange equipment Fermentation, filtration and extraction equipment Drying, dispersion and mixing equipment Distillation concentration equipment Others Evaporation concentration equipment Steaming and hydrolyzing equipment Crushing equipment Pressing and extracting equipment Cooling equipment Conveying equipment Pressure vessel Melt crystallization technology and equipmentPerformance